Alameda Pulse
The Alameda Pulse
Eats · Events · Experiences
All Alameda news
Transportation

Woodstock, the Water Shuttle, Is Running Again

Engine failures and a cracked bracket kept the Oakland-Alameda shuttle docked for nearly three weeks. It's back as of Wednesday morning, but the outage shows why riders want a second boat.

By The Alameda Pulse

The Water Shuttle, the small yellow passenger boat that carries riders between Oakland and Alameda, shown docked in a file photo from SF Bay Ferry
SF Bay Ferry (opens in a new tab)

The free water shuttle that carries riders between Oakland and Alameda's West End is back on the water after nearly three weeks tied up with engine trouble. Woodstock, as the boat is known, resumed service at 7:20 a.m. on Wednesday, August 26, so if you've been stuck taking the long way around, you can hop back on now.

What knocked Woodstock out of service

The trouble started August 4, when the shuttle blew a gasket in one of its two engines. Crews swapped in a backup engine, but that one failed too. Then, while mechanics were working on the boat, they found something else wrong: a small fracture on a bracket above the waterline that needed to be welded shut before Woodstock could go back to carrying passengers.

Why it took so long to fix

By last Saturday morning, replacement engines were in and running. But the cracked bracket held things up a little longer. "The engines have been installed and were functioning as of Saturday morning. But we found a small fracture on a bracket above the waterline and are now welding a repair," said Tom Hall of SF Bay Ferry, which operates the shuttle. That repair got finished up in time for Wednesday's relaunch, three weeks after the boat first went down.

Why this matters if you ride the shuttle

The bigger issue here is that Woodstock is doing this job alone. The route runs on a single boat, so when something breaks, there's no backup waiting in the wings and the whole service just stops until it's fixed. Anyone who leans on the shuttle to skip the Webster Tube backup or catch a ferry connection on the Oakland side just spent three weeks without that option.

That single-boat setup is part of why SF Bay Ferry is now studying funding options for a second, purpose-built boat, so a mechanical problem doesn't take the entire route offline again. It's a real gap: a free, popular crossing with no backup plan when the one boat running it needs a mechanic.

The shuttle's longer-term future is already secured. We reported in July that the service is now funded through June 2028, so the free rides across the estuary aren't going anywhere. This latest breakdown is a reminder that keeping the shuttle funded and keeping it running smoothly aren't quite the same problem, and the second one still needs a fix.

Source: sf.streetsblog.org (opens in a new tab)


Alameda Pulse

Stay in the Alameda loop

Get the best of Alameda in your inbox every Thursday. Free.