Alameda Pulse
The Alameda Pulse
Eats · Events · Experiences
All Alameda news
Transportation

Cross Alameda Trail Now Connects to the Fruitvale Bridge

A new protected stretch on Tilden Way closes the gap that used to force riders into a long detour, and it opened ahead of schedule.

By The Alameda Pulse

Cyclists on the east end of the island got a win in early July. A new protected bike and pedestrian connection opened on Tilden Way, and it opened ahead of schedule.

It's part of the Clement Avenue and Tilden Way Improvement Project, the work that's been tying up that corner since January. The new stretch links the Cross Alameda Trail to the Miller Sweeney Bridge, better known around here as the Fruitvale Bridge, and to the Bridgeside Shopping Center.

What this actually fixes

Until now, construction barriers on this stretch pushed people on bikes and on foot into a long detour. If you wanted to get from the trail to the bridge, you went around.

Now it's a straight shot. You can ride from the Cross Alameda Trail at Broadway across toward Oakland's Jingletown neighborhood without hunting for a workaround.

Denyse Trepanier of Bike Walk Alameda wrote on social media that "This is going to be such a game-changer!", as Streetsblog SF first reported.

A rail corridor, reused

The route follows a defunct railway corridor. That old line once served a lift bridge across the estuary channel. The tracks are gone, and the path they cut through the island is becoming bike infrastructure instead.

One design detail worth calling out: the project uses angled curbs between the bike and pedestrian space. If a rider drifts over the edge, an angled curb lets the wheel roll back instead of catching it and throwing them. It's a small thing that prevents a specific and very common crash.

Still to come

What's open now is a temporary configuration, with the permanent build expected between August and mid-September 2026.

And one honest caveat. The Fruitvale Bridge itself still isn't great for bikes. The four-lane deck has only a narrow painted lane, so plenty of riders use the sidewalk instead. The new connection gets you to the bridge safely. The bridge crossing is still the weak link.

If you're piecing together a car-free route, Woodstock, the free water shuttle, is the other way across the estuary, and it takes bikes. It's now funded through 2028.

More on the island's road and bike work in our piece on Central Avenue construction.

Source: sf.streetsblog.org (opens in a new tab)


Alameda Pulse

Stay in the Alameda loop

Get the best of Alameda in your inbox every Thursday. Free.